Factory readiness check
Tick what your handoff already contains. The score is weighted by what actually blocks a factory quote, so you know what to fix before you pay for a sample.
Sending this now usually means paying for a sample that does not match your intent.
Design intent
Materials
Measurements
Pattern & cutting
Construction & compliance
Commercials
Fix these before you send
- Front and back technical flats
- Complete bill of materials
- Fabric fiber content and weight (GSM)
- Points of measure defined and illustrated
- Full graded size run
- Graded pattern files (DXF or SVG)
- Construction notes and stitch types
Questions
What does the score mean?
Each item is weighted by how often it blocks a quote. Blocking items must be present before a factory can price the style at all; supporting items reduce back-and-forth and sampling rounds. The score is the share of weighted items you have covered.
Why are pattern files weighted so heavily?
Without graded pattern files a factory has to draft the pattern themselves, which changes fit, adds cost and moves ownership of the block. Sending DXF plus a PDF of the flats keeps the pattern yours.
Does this send my data anywhere?
No. The checklist runs entirely in your browser and the exported report is generated locally.