Skip to content
Free tool

Factory readiness check

Tick what your handoff already contains. The score is weighted by what actually blocks a factory quote, so you know what to fix before you pay for a sample.

Score
0%
Not ready to send

Sending this now usually means paying for a sample that does not match your intent.

Design intent

Materials

Measurements

Pattern & cutting

Construction & compliance

Commercials

Fix these before you send

  • Front and back technical flats
  • Complete bill of materials
  • Fabric fiber content and weight (GSM)
  • Points of measure defined and illustrated
  • Full graded size run
  • Graded pattern files (DXF or SVG)
  • Construction notes and stitch types
Build the tech pack

Questions

What does the score mean?

Each item is weighted by how often it blocks a quote. Blocking items must be present before a factory can price the style at all; supporting items reduce back-and-forth and sampling rounds. The score is the share of weighted items you have covered.

Why are pattern files weighted so heavily?

Without graded pattern files a factory has to draft the pattern themselves, which changes fit, adds cost and moves ownership of the block. Sending DXF plus a PDF of the flats keeps the pattern yours.

Does this send my data anywhere?

No. The checklist runs entirely in your browser and the exported report is generated locally.